Bind New Wave Quiltdone 10/21 see finished quilt here- Bind Rainbow Quilt
- Finish Dresden Top
- Finish Chopsticks
- Modern She Made, Round 2
Modernista Swapdone 10/28Mod Mosaic Blocks - Octoberdone 10/3- Mod Mosaic Blocks - November
- Mod Mosaic Blocks - December
Modern 99 Block - Octoberdone 10/2Modern 99 Block - Novemberdone 10/20- Modern 99 Block - December
Cut Charm Squares for Sewing Summit Charm Swapdone 10/10Cut 10" Squares for Black/White Swapdone 9/27PrepareFabricandPattern for Lounge Pant classdone 9/28- Quilt for Christmas for surprise recipient
- Make at least one project with a zipper
- Cut out Plus Quilt
- Boat Block
- Start (and finish) Big 10 Quilt started 10/20
and other projects not included in original list are:
- buy, cut and mail fabric for Kona neutral swap ~ done 10/22
- Holiday mug rug swap - mail by Dec 9(in the works)
I needed something like this. To keep track of the insane amount of projects I have going on, most with self-made due dates that are long overdue. I wonder if it is even possible to get 4 quilts finished (three tops/backs done, one not even started), two train engineer hats, and two stuffed dolls done for Christmas (my self-made due date). With Thanksgiving less than 2 weeks away, I don't think so... :(
ReplyDeleteYou have made quite a dent in your hustle list! And you have a tall order of hustling. Way to go! Lots of quilty goodness. What is this boat block you are planning on doing? Keep up the awesome hustling.
ReplyDeletecheers!
-kim
You're making great progress!! Keep Hustling!
ReplyDeleteGreat progress for the half way mark, congrats. My problem is all the new items that I add to my lists outweigh the ones I cross off :)
ReplyDelete